References

Delivered, and in execution. Not the same list.

A reference list that mixes completed installations with running contracts is a pipeline, not a reference list. Ours separates them — and says which is which on every line.

Reference markets
Africa · CIS · Central Asia · MENA · Southeast Asia
Largest CIP reference
42,000 BPH glass line, Tanzania
Confidentiality
End clients withheld where contracted
Verification
FAT reports and site video on request
Loaded for site — vessels wrapped and secured
Loaded for site — vessels wrapped and secured
Outbound — completed sets on the trailer
Outbound — completed sets on the trailer
REFERENCE 01 — EAST AFRICA

A CIP set for a 42,000 BPH glass-bottle line.

Supplied through an EPC contractor for an international brewing group in Tanzania. The set is sized for at least 45 t/h and 3 bar at the filler inlet — the kind of duty where an undersized return line shows up on the first production shift, not in the datasheet.

Contracted 15 June 2026; contractual delivery date 15 July 2026. We describe the status as contracted with a delivery date rather than shipped, because the contract only fixes the latest delivery date.

42,000 BPH ≥45 t/h ≥3 bar at filler inlet Through EPC contractor
42,000bottles per hour — line capacity served by the CIP set
45t/h minimum flow at the filler inlet
3bar minimum pressure at the filler inlet
2026contracted; delivery date 15 July 2026

Why the end client is not named

The contract was signed through the EPC contractor and includes a confidentiality clause covering the end user. We can share the process parameters, the equipment scope and the delivery record, and where the contractor agrees, we can arrange a call.

All references

By region and scope.

Delivered installations are listed first. Contracts in execution follow, marked as such — including three we would rather not present as finished references.

Tanzania

International brewing group — 42,000 BPH glass-bottle line

CIP system sized ≥45 t/h and ≥3 bar at the filler inlet. Contracted 15 June 2026; delivery date 15 July 2026. Supplied through the EPC contractor.

Delivered 2026
Mongolia

Pepsi bottler — 12,000 BPH PET line, process section

Blending, heat treatment and CIP for a carbonated soft-drink line. Delivered and invoiced.

Delivered
Russia · Kazakhstan

Process sections and CIP systems

Multiple installations including Chechnya, for carbonated, juice and dairy applications.

Delivered
Morocco · French Polynesia
Afghanistan · Pakistan

Process sections for carbonated and juice lines

Blending, pasteurisation and CIP packages supplied into lines integrated by others.

Delivered
Malaysia · Indonesia
Vietnam

Process sections and CIP systems

Southeast Asian installations; photographs and process parameters available with customer names withheld.

Delivered
Kenya

3 t/h juice and carbonated process section

Contract in execution — not yet a completed installation.

In execution
Sudan

10 t/h juice process section

Contract in execution — not yet a completed installation.

In execution
Chad

22.5 t/h carbonated plus 9 t/h juice

Contract in execution — two process sections on one site, at different capacities.

In execution
Verification

What we can put in front of you.

A reference list is a claim. These are the things that let you check it. We would rather you spent an hour on the evidence than an afternoon on a brochure.

  • Photographs and process parameters of delivered Southeast Asian and Central Asian installations, with customer names withheld.
  • Shop-floor video of equipment in current fabrication — welding, polishing, assembly and pressure testing.
  • Factory acceptance test report from a recent skid, showing capacity, holding time and CIP verification results.
  • Material certificates — EN 10204 3.1, batch-traceable to the plate or tube in the machine.

Factory visit — Yangzhou

We will host a visit to the works, including the fabrication bays and a running test of a pasteuriser skid. It is a two-hour drive from Shanghai Hongqiao and can be combined with a supplier audit in Jiangsu.

If a visit is not practical, we will run the acceptance test by video call and record it, with the instrument readings visible in frame.

Arrange a visit or a call

Ask for the reference closest to your process.

Tell us the product and capacity, and we will send the two or three installations that are actually comparable — including the ones that are still running.